Home » 2011 » March

642-813 Q&A Index (Section1 – Implement VLAN based solution)

Section1 – Implement VLAN based solution, given a network design and a set of requirements • Determine network resources needed for implementing a VLAN based solution on a network • Create a VLAN based implementation plan • Create a VLAN based verification plan • Configure switch-to-switch connectivity for...
Continue reading »

642-813 Q&A – Implement VLAN based solution (71-76)

Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 71 Which three items are configured in MST configuration submode? (Select three) A. Region name B. Configuration revision number C. VLAN instance map D. IST STP BPDU hello timer E....
Continue reading »

642-813 Q&A – Implement VLAN based solution (66-70)

Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 66 While using a packet analyzer, you notice four additional bytes being added to the packets in the Company network. Which protocol inserts a four byte tag into the Ethernet...
Continue reading »