Home » SWITCH 642-813 Q&As » Archive by category642-813 Q&A Index

642-813 Q&A Index (Section 5 – Implement High Availability)

Section 5 – Implement High Availability, given a network design and a set of requirements • Determine network resources needed for implementing High Availability on a network • Create a High Availability implementation plan • Create a High Availability verification plan • Implement first hop redundancy protocols •...
Continue reading »

642-813 Q&A Index (Section1 – Implement VLAN based solution)

Section1 – Implement VLAN based solution, given a network design and a set of requirements • Determine network resources needed for implementing a VLAN based solution on a network • Create a VLAN based implementation plan • Create a VLAN based verification plan • Configure switch-to-switch connectivity for...
Continue reading »