Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 16 Two Company switches are connected via a trunk link. In this network, the original frame is encapsulated and an additional header is added before the frame is carried over...
Continue reading
March 8, 2011 admin
Section 1 - VLAN, SWITCH 642-813 Q&As
Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 11 VTP is configured on switch R1. Which of the following features were added in VTP version 2 that were not previously supported in VTP version 1? (Select two) A....
Continue reading
March 8, 2011 admin
Section 1 - VLAN, SWITCH 642-813 Q&As
Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 6 Two Company switches are connected via a trunk using VTP. Which VTP information does a Catalyst switch advertise on its trunk ports when using VTP? (Select two) A. STP...
Continue reading
March 7, 2011 admin
Section 1 - VLAN, SWITCH 642-813 Q&As
Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 1 VTP devices in a network track the VTP revision number. What is a VTP configuration revision number? A. A number for identifying changes to the network switch. B. A...
Continue reading
March 7, 2011 admin
Section 1 - VLAN, SWITCH 642-813 Q&As
Acme is a small shipping company that has an existing enterprise network comprised of 2 switches;DSW1 and ASW2. The topology diagram indicates their layer 2 mapping. VLAN 40 is a new VLAN that will be used to provide the shipping personnel access to the server. For security reasons,...
Continue reading
March 3, 2011 admin
642-813 Lab-Simulation, SWITCH 642-183 Exam
You have been tasking with configuring multilayer SwitchC,which has a partial configuration and has been attached to RouterC as shown in the topology diagram. You need to configure SwitchC so that Hosts H1 and H2 can successfully ping the server S1. Also SwitchC needs to be able to...
Continue reading
March 3, 2011 admin
642-813 Lab-Simulation, SWITCH 642-183 Exam
You have been tasked with configuring SwitchB,which has a minimal configuration and has been added to the existing network shown in the topology diagram. SwitchA is currently configured correctly.but will need to be modified to support the addition of SwtichB. The VTP and STP configuration modes on SwitchA...
Continue reading
March 2, 2011 admin
642-813 Lab-Simulation, SWITCH 642-183 Exam
In this post will provide the CCNP SWITCH 642-813 self-study resources, it will help you study and pass the exam. By the way, if you have other more resources, plz share with us. Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified...
Continue reading
March 2, 2011 admin
SWITCH Certification, SWITCH Resources
To pass the CCNP SWITCH exam, you’ve got to keep a lot of tips and tricks in mind. 1. Please tell me how many questions in the real SWITCH exam, and how much time to answer them? There are 56 questions, including 3 lab-sim. You have 120 minutes...
Continue reading
February 22, 2011 admin
SWITCH Certification, SWITCH Tips&Tricks
Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP®, and Cisco Certified Design Professional CCDP® certifications. The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear...
Continue reading
February 22, 2011 admin
SWITCH Certification, SWITCH Introduction
CCNP SWITCH (642-813) exam is a one of the professional level exam from CISCO. CCNA is pre requisition for this exam. This CISCO exam replaced the old BCMSN (642-812).This exam will help to deeply understanding the concepts of Switching. This exam Associated certification not only for CCNP but...
Continue reading
February 22, 2011 admin
SWITCH Certification, SWITCH Introduction
Pages:
1
2
...
192
193
194
195
196
197
198
199