Question 4
Place the DTP mode with its correct description.
Question 5
You have a VLAN implementation that requires inter-vlan routing using layer 3 switches. Drag the steps on the left that should be part of the verification plan to the spaces on the right. Not all choices will be used.
Question 6
You have been tasked with planning a VLAN solution that will connect a server in one buliding to several hosts in another building. The solution should be built using the local vlan model and layer 3 switching at the distribution layer. Identify the questions related to this vlan solution that would ask the network administrator before you start the planning by dragging them into the target zone one the right. Not all questions will be used.