Home » Posts tagged CRC

642-813 Q&A – Implement VLAN based solution (16-20)

Section 1 – Implement VLAN based solution, given a network design and a set of requirements QUESTION NO: 16 Two Company switches are connected via a trunk link. In this network, the original frame is encapsulated and an additional header is added before the frame is carried over...
Continue reading